Conceptual Model Testing 概念阶段模型试验
Once one or more designs come off the drawing table, the designers and architects may need to carry out swift model tests to check whether the vessel can perform as they expected, in many cases with different variants. The time schedule should be short and the focus will be on the relative differences among all variants. Stock propulsion systems – conventional, thruster or POD, will be used in these tests. With the joint facilities of SSSRI and MARIN, we are able to carry out the conceptual model tests with quick response and revertible price.
一个或多个设计完成后,设计师或船舶工程师都需要进行快速的模型试验来校验设计是否能达到他们预期的要求,而且许多情况下参数都会变化。时间日程紧凑,重点关注所有参数中相对差别。备用桨系统-常规桨,推进器或电力推进装置,都将在这些试验中采用。合资公司是快速和经济地进行概念性模型试验的最佳选择。